SABER/STRIDE II 28/34 98570 8/31/99YREV.OWNER’S GUIDERead these instructions before operating the machineAntes de usar la máquina lea atentamente e
10MAINTENANCESABER/STRIDE II 28/34 98570 7/14/98SCRUB DECK SKIRT AND SQUEEGEEThe skirts and squeegee should be inspected for wear and damage. The sk
11MAINTENANCESABER/STRIDE II 28/34 98570 7/14/98ADJUSTING SQUEEGEEAdjusting the squeegee is a two part process. First, the squeegee tool must have c
12BATTERIESSABER/STRIDE II 28/34 98570 7/14/98The batteries provide the power to operate the machine. The standard are four 6 volt batteries rated
13SABER/STRIDE II 28/34 98570 7/14/98BATTERIESTO CHARGE THE BATTERIESWhen servicing machine, avoid contact with bat-tery acid.Batteries emit hydrog
14SERVICE SCHEDULESABER/STRIDE II 28/34 98570 5/1/98Maintenance Item Daily Weekly Monthly AnnuallyCheck Battery water level *Check Vac Hose Connecti
15SABER/STRIDE II 28/34 98570 9/15/98SQUEEGEE BLADE/BRUSH HEAD OPTIONSP/N Desc. ColorS28 /QQS28S34 /QQS34S34SP /QQS34SP73932 FRONT, STANDARD RED X
16SERVICE LOCATION DETAILSSABER/STRIDE II 28/34 98570 5/1/982BRUSH HEAD MODELS: S28, S34, QQS28, QQS34342CYLINDRICAL HEAD MODELS: S34SP, QQS34SP34
SERVICE LOCATION PARTS LISTSABER/STRIDE II 28/34 98570 7/9/981733Ref Part No. Qty DescriptionSerial No.Notes:From To 1 70532 6 SCR, 10-32 X 1/2 PPHM
2MACHINE DATA LOGMODEL DATE OF PURCHASE SERIAL NUMBER SALES REPRESENTATIVE #DEALER
3SABER/STRIDE II 28/34 98570 10/08/98TABLE OF CONTENTSOPERATIONSMachine Data Log . . . . . . . . . . . . . . . . . . . . . . . . 2Table of Conte
4SAFETYSABER/STRIDE II 28/34 98570 7/14/98The following symbols are used throughout this guide asindicated in their descriptions: HAZARD INTENSITY L
5TECHNICAL SPECIFICATIONSSABER/STRIDE II 28/34 98570 5/1/9845”69”View: Side view of machineMODEL:SABER/STRIDE II 28/34Year of Construction: 1998No
6OPERATION CONTROLSSABER/STRIDE II 28/34 98570 5/1/981. Squeegee /Vacuum Switches. Turns on and off the vacuum and squeegee system seperately if des
7SABER/STRIDE II 28/34 98570 5/1/98MACHINE OPERATIONSTARTING MACHINENOTE: Perform pre-run machine check before operating machine.FOR SAFETY: Befor
8SABER/STRIDE II 28/34 98570 7/14/98MACHINE OPERATIONDOUBLE SCRUBFloors which are heavily soiled or have thick accumulations of floor finish may not
9MAINTENANCESABER/STRIDE II 28/34 98570 7/14/98SCRUB BRUSHESNOTE: All original equipment brushes are equipped with “Perform Alert©. This feature
Kommentare zu diesen Handbüchern